Wednesday, February 19, 2025

Satisfactory Nuclear Setup

 


5 Nuclear Power Plants all going 100% with no waste, no alternate recipes. Copied from TotalXclipse but it is not on his page anymore.. 


From my main base.. I belt in:
  • Heat Sinks (5 per minute)
  • Copper Sheets (50 per minute)
  • Concrete  (141 per min)
  • Stator (15 per minute)
  • Steel Beams (18 per min)
  • Quickwire (200 per minute)
  • Sulfur (105 per minute)
  • Uranium (150 per minute)
  • Iron Plates (10 per minute)
  • Quartz (30 per minute)
  • Lots of water... Each reactor takes 240 per minute, then more for the acid and 

  • The Steel Beams and Concrete are combined to make Encased Industrial Beams at 1 Assembler 
  • The Copper Sheets and Quickwire are combined to make AI Limiters at 2 Assemblers 
  • The AI Limiters assembler outputs are each fed to an assembler to combine with the stators to make Electromatic Control Rods (2 Assemblers)
  • The Sulfur is combined with Water to make Sulfuric Acid at 2 Refineries. One needs to have a 10% output increase. The water to one of them is partially piped in from the overflow of the non-fissile uranium production.
  • The Sulfuric Acid connects to the 3 blenders limited to 30 per minute each which all make the Encased Uranium from the raw uranium and concrete. Each blender connects the acid back on itself after the limiter providing the 10 sulfuric needed to needed to make it 100%. 















  • Encased Uranium is directly output to each of the 3 Manufactures  which combine the Encased Uranium with the Encased Industrial beams and Electromagnetic control rods. These three are evenly split out to each of the 5 Reactors
  • 120 Nitrogen Gas is combined with water and 10 iron plates per minute to make Nitric Acid at 1 Blender
  • The Nitric Acid is fed into a 100% overclocked blender and combined with 100 Silica per minute, Sulfuric Acid, and the Uranium Waste to make Non Fissile Uranium. The overflow water goes back to the sulfuric acid refinery.
  • The Non-Fissile and more Uranium Waste are combined to make Plutonium Pellets in the 1 Particle Accelerator. 
  • The Plutonium Pellets are sent to 3 Assemblers to be combined with concrete to make Encased Plutonium Cells
  • The Encased Plutonium Cells are sent to 2 manufactures and combined with steel beams, electromagnetic control rods, and heat sinks to make Plutonium Fuel Rods
  • And finally the Plutonium Fuel Rods are resource sinked





















Here is the link to TotalXclipse's video.



No comments:

Post a Comment